Control of Well (OEE) Insurance in the UAE — Explained
Tameen Insurance Advisor · UAE insurance information
Table of contents
Control of Well insurance — technically called Operators Extra Expense (OEE) and often written on the AAU wording (Association of American Underwriters) or the JR-form London wording — is the single most important policy on any UAE upstream operator or drilling-contractor programme. A single sour-gas blowout in the ADNOC Onshore or Sour Gas fields can produce a USD 100m–USD 500m loss.
The Three Sections of an OEE Policy
Section I — Control of Well. Pays the actual, direct costs incurred to bring the well under control, including specialist well-control contractors (Boots & Coots, Cudd, Wild Well Control), rig damage, kill fluids, additional personnel and firefighting equipment. Trigger is a physical blowout, cratering, cratered hole or underground blowout.
Section II — Redrill / Extra Expense. Pays the cost of redrilling, restoring or plugging the well back to the depth at which control was lost, plus recompletion.
Section III — Seepage, Pollution, Contamination & Clean-up. Pays third-party pollution clean-up costs, containment, evacuation and property damage caused by escaping hydrocarbons or contaminants. Section III is what turns a USD 20m Section I loss into a USD 200m combined loss.
Who Buys OEE in the UAE
• ADNOC Onshore, ADNOC Offshore and their JV partners (INPEX, TotalEnergies, GS Energy, JODCO, CEPSA)
• Dragon Oil (RAK)
• Crescent Petroleum (Sharjah)
• Drilling contractors (ADNOC Drilling, KCA Deutag, ADES, Shelf Drilling, COSL)
• Well-services and pressure-pumping contractors
• Coiled-tubing, wireline and slickline specialists
Typical Limits and Structure
UAE OEE limits are set by well cost and reservoir characteristics:
| Well Type | Typical Combined Section I+II+III Limit |
|---|---|
| Shallow onshore development | USD 25m – USD 50m |
| Standard onshore exploration | USD 50m – USD 100m |
| Sour-gas HP/HT onshore | USD 150m – USD 300m |
| Standard offshore | USD 100m – USD 200m |
| HP/HT sour offshore | USD 250m – USD 500m |
Section III (pollution) is often written with a lower sub-limit — typically 25–50% of the Section I limit — but for offshore and coastal onshore wells lenders and JV partners increasingly demand 100% parity.
Deductibles and Cost
UAE 2026 OEE cost per well (annualised):
• Standard onshore: USD 3,000 – USD 6,000 per well
• Sour-gas onshore HP/HT: USD 8,000 – USD 15,000 per well
• Standard offshore: USD 5,000 – USD 10,000 per well
• Offshore HP/HT: USD 10,000 – USD 22,000 per well
Deductibles run USD 1m – USD 5m per well and are usually per-section (i.e. a separate deductible on Section I, II and III).
Contractual Requirements
Every ADNOC drilling contract requires the drilling contractor to be a Named Insured or Additional Insured on the operator's OEE policy, with Waiver of Subrogation and Cross-Liability. Where the drilling contractor holds its own OEE (a Contractor's OEE), the two policies co-exist on a primary-and-difference-in-limits basis.
Place OEE Through Tameen Insurance
Tameen Insurance places OEE for UAE operators and drilling contractors with the specialist London and Zurich energy markets (Beazley, Hive, Talbot, AXIS, Munich Re, Swiss Re Corporate Solutions, Zurich, AIG Energy), fronted by ADNOC-approved local carriers. Send your well schedule, drilling programme, mud weights, H2S %, depth and BHP/BHT data for a full quote. WhatsApp Tameen Insurance on 052 453 8714, or visit the Business Insurance UAE page.
Frequently Asked Questions
What is the difference between OEE and Physical Damage insurance?▾
Physical Damage covers the operator's own hardware — rigs, wellheads, gathering stations, platforms. OEE covers the cost of controlling a well after a blowout, redrilling it, and third-party pollution. The two are separate policies with different triggers and both are needed on any upstream programme.
Is Control of Well insurance mandatory in the UAE?▾
It is not federally mandatory but every ADNOC upstream contract requires it and no lender or JV partner will fund a well without it. In practice it is compulsory for any UAE upstream operator or drilling contractor.
How much does OEE insurance cost per well in the UAE?▾
Standard onshore wells run USD 3,000–6,000 per well annually. Sour-gas HP/HT wells run USD 8,000–15,000 onshore and USD 10,000–22,000 offshore, depending on limits and deductibles chosen. Tameen Insurance benchmarks OEE per well for the UAE market — WhatsApp 052 453 8714.