    Insuring a Data Centre Build in the UAE — CAR, EAR and Delay in Start-Up

    8 min readUpdated: October 28, 2026By Tameen Technology & Property Risk Desk

    Tameen Insurance Advisor · UAE commercial property, engineering and cyber placements

    Table of contents

    A data centre build is not a normal building project. A large share of the value is in electrical and mechanical plant — transformers, switchgear, UPS, generators and chillers — installed and tested in the final months. That changes how the project should be insured.

    The core construction covers

    • Contractors' All Risks (CAR) for civil and structural works. See contractors' all risk insurance.

    • Erection All Risks (EAR) for installation of plant and equipment, or a combined CAR/EAR policy.

    • Third-party liability under the same policy for injury and damage to others.

    • Marine cargo and inland transit for imported long-lead equipment.

    • Delay in Start-Up (DSU / ALOP) for the developer's lost income if insured damage delays completion.

    • Employers' liability and workmen's compensation for site labour.

    Testing and commissioning

    Most serious losses on data centre projects happen when systems are energised for the first time. Check that the policy period includes the full testing schedule, that 'hot' testing under load is covered, and how long the maintenance period runs after handover.

    Delay in Start-Up

    If a transformer is damaged weeks before opening, the replacement may take many months. DSU pays the developer's lost gross profit or debt service during that delay. It is often required by lenders and must be bought with the CAR/EAR policy, not added later.

    Who buys what

    On large projects the developer often arranges a single project policy covering all contractors; on smaller fit-outs each contractor may insure its own works. Either way, the contract should state who arranges cover, the deductibles each party carries, and whether subcontractors are named insureds. Performance bonds and advance payment guarantees are separate — see surety bonds for construction companies.

    Talk to Tameen

    Building or fitting out a data centre in the UAE? WhatsApp the Tameen commercial desk on 052 453 8714 or request a quote with the contract value, programme and equipment list.

    Speak to an Energy Insurance Specialist
    1-hour response window · corporate desk · fully confidential

    Buyer Decision Checklist

    • Confirm who arranges the project policy under the contract.
    • Include EAR cover for all plant installation and testing.
    • Agree the DSU indemnity period with lenders before binding.
    • Insure long-lead equipment in transit and in storage.

    Common Mistakes to Avoid

    • ✕Buying CAR only and leaving plant testing uncovered.
    • ✕Trying to add delay in start-up after the project has started.
    • ✕Ignoring transit and off-site storage of high-value equipment.

    Frequently Asked Questions

    Is CAR enough for a data centre project?▾

    Usually not on its own. Installing and testing power and cooling plant needs Erection All Risks cover or a combined CAR/EAR policy.

    What is Delay in Start-Up insurance?▾

    It covers the project owner's lost income or debt costs when insured damage during construction delays the opening date.

    External References

    AI-Powered Insurance Recommendations

    Want the actual price for your situation?

    Corporate Insurance Desk — a real quote within the hour, no broker fee.

    Business insurance UAE →
    Corporate Desk

    Run a business? Get a free corporate insurance review

    2026 benchmarks for D&O, Cyber, Group Medical, PI, Public Liability, Marine & more — 24-hour turnaround.

    Ready to get your quote?

    Send your insurance requirement on WhatsApp or call directly for quick assistance.